DREDGING WORK FOR NAVIGATIONAL CHANNEL OF GUANGZHOU PORT

Published:2015-06-02

 

 

The navigational channel of Guangzhou Port has a total length of 115km and water depth within -8.6m dredging depth ~-13.5m. The Lingding navigational channel has been dredged to be -15.5m in depth and the dredging work quantity exceeds 120,000,000m3.

SITE MAP

World Time

  • SENEGAL | DAKAR:09.09 11:03

  • NIGERIA | LAGOS:09.09 12:03

  • EGYPT | CAIRO:09.09 13:03

  • UAE | DUBAI:09.09 15:03

  • SRI LANKA | COLOMBO:09.09 16:33

  • SINGAPORE:09.09 19:03

  • ENGLAND | LONDON:09.09 12:03

  • RUSSIA | MOSCOW:09.09 15:03

  • CHINA | BEIJING:09.09 19:03

  • AMERICA | Los Angels:09.09 04:03

  • AMERICA | New York:09.09 07:03

  • BRAZIL | San Paulo:09.09 08:03