DREDGING WORK FOR NAVIGATIONAL CHANNEL OF GUANGZHOU PORT

Published:2015-06-02

 

 

The navigational channel of Guangzhou Port has a total length of 115km and water depth within -8.6m dredging depth ~-13.5m. The Lingding navigational channel has been dredged to be -15.5m in depth and the dredging work quantity exceeds 120,000,000m3.

SITE MAP

World Time

  • SENEGAL | DAKAR:09.29 12:22

  • NIGERIA | LAGOS:09.29 13:22

  • EGYPT | CAIRO:09.29 14:22

  • UAE | DUBAI:09.29 16:22

  • SRI LANKA | COLOMBO:09.29 17:52

  • SINGAPORE:09.29 20:22

  • ENGLAND | LONDON:09.29 13:22

  • RUSSIA | MOSCOW:09.29 16:22

  • CHINA | BEIJING:09.29 20:22

  • AMERICA | Los Angels:09.29 05:22

  • AMERICA | New York:09.29 08:22

  • BRAZIL | San Paulo:09.29 09:22