DREDGING WORK FOR NAVIGATIONAL CHANNEL OF GUANGZHOU PORT

Published:2015-06-02

 

 

The navigational channel of Guangzhou Port has a total length of 115km and water depth within -8.6m dredging depth ~-13.5m. The Lingding navigational channel has been dredged to be -15.5m in depth and the dredging work quantity exceeds 120,000,000m3.

SITE MAP

World Time

  • SENEGAL | DAKAR:06.07 04:34

  • NIGERIA | LAGOS:06.07 05:34

  • EGYPT | CAIRO:06.07 06:34

  • UAE | DUBAI:06.07 08:34

  • SRI LANKA | COLOMBO:06.07 10:04

  • SINGAPORE:06.07 12:34

  • ENGLAND | LONDON:06.07 05:34

  • RUSSIA | MOSCOW:06.07 08:34

  • CHINA | BEIJING:06.07 12:34

  • AMERICA | Los Angels:06.06 21:34

  • AMERICA | New York:06.07 00:34

  • BRAZIL | San Paulo:06.07 01:34