DREDGING WORK FOR NAVIGATIONAL CHANNEL OF GUANGZHOU PORT

Published:2015-06-02

 

 

The navigational channel of Guangzhou Port has a total length of 115km and water depth within -8.6m dredging depth ~-13.5m. The Lingding navigational channel has been dredged to be -15.5m in depth and the dredging work quantity exceeds 120,000,000m3.

SITE MAP

World Time

  • SENEGAL | DAKAR:12.16 20:45

  • NIGERIA | LAGOS:12.16 21:45

  • EGYPT | CAIRO:12.16 22:45

  • UAE | DUBAI:12.17 00:45

  • SRI LANKA | COLOMBO:12.17 02:15

  • SINGAPORE:12.17 04:45

  • ENGLAND | LONDON:12.16 21:45

  • RUSSIA | MOSCOW:12.17 00:45

  • CHINA | BEIJING:12.17 04:45

  • AMERICA | Los Angels:12.16 13:45

  • AMERICA | New York:12.16 16:45

  • BRAZIL | San Paulo:12.16 17:45