DREDGING WORK FOR NAVIGATIONAL CHANNEL OF GUANGZHOU PORT

Published:2015-06-02

 

 

The navigational channel of Guangzhou Port has a total length of 115km and water depth within -8.6m dredging depth ~-13.5m. The Lingding navigational channel has been dredged to be -15.5m in depth and the dredging work quantity exceeds 120,000,000m3.

SITE MAP

World Time

  • SENEGAL | DAKAR:02.01 21:04

  • NIGERIA | LAGOS:02.01 22:04

  • EGYPT | CAIRO:02.01 23:04

  • UAE | DUBAI:02.02 01:04

  • SRI LANKA | COLOMBO:02.02 02:34

  • SINGAPORE:02.02 05:04

  • ENGLAND | LONDON:02.01 22:04

  • RUSSIA | MOSCOW:02.02 01:04

  • CHINA | BEIJING:02.02 05:04

  • AMERICA | Los Angels:02.01 14:04

  • AMERICA | New York:02.01 17:04

  • BRAZIL | San Paulo:02.01 18:04