DREDGING WORK FOR NAVIGATIONAL CHANNEL OF GUANGZHOU PORT

Published:2015-06-02

 

 

The navigational channel of Guangzhou Port has a total length of 115km and water depth within -8.6m dredging depth ~-13.5m. The Lingding navigational channel has been dredged to be -15.5m in depth and the dredging work quantity exceeds 120,000,000m3.

SITE MAP

World Time

  • SENEGAL | DAKAR:04.10 13:30

  • NIGERIA | LAGOS:04.10 14:30

  • EGYPT | CAIRO:04.10 15:30

  • UAE | DUBAI:04.10 17:30

  • SRI LANKA | COLOMBO:04.10 19:00

  • SINGAPORE:04.10 21:30

  • ENGLAND | LONDON:04.10 14:30

  • RUSSIA | MOSCOW:04.10 17:30

  • CHINA | BEIJING:04.10 21:30

  • AMERICA | Los Angels:04.10 06:30

  • AMERICA | New York:04.10 09:30

  • BRAZIL | San Paulo:04.10 10:30