DREDGING WORK FOR NAVIGATIONAL CHANNEL OF GUANGZHOU PORT

Published:2015-06-02

 

 

The navigational channel of Guangzhou Port has a total length of 115km and water depth within -8.6m dredging depth ~-13.5m. The Lingding navigational channel has been dredged to be -15.5m in depth and the dredging work quantity exceeds 120,000,000m3.

SITE MAP

World Time

  • SENEGAL | DAKAR:10.28 13:16

  • NIGERIA | LAGOS:10.28 14:16

  • EGYPT | CAIRO:10.28 15:16

  • UAE | DUBAI:10.28 17:16

  • SRI LANKA | COLOMBO:10.28 18:46

  • SINGAPORE:10.28 21:16

  • ENGLAND | LONDON:10.28 14:16

  • RUSSIA | MOSCOW:10.28 17:16

  • CHINA | BEIJING:10.28 21:16

  • AMERICA | Los Angels:10.28 06:16

  • AMERICA | New York:10.28 09:16

  • BRAZIL | San Paulo:10.28 10:16