DREDGING WORK FOR NAVIGATIONAL CHANNEL OF GUANGZHOU PORT

Published:2015-06-02

 

 

The navigational channel of Guangzhou Port has a total length of 115km and water depth within -8.6m dredging depth ~-13.5m. The Lingding navigational channel has been dredged to be -15.5m in depth and the dredging work quantity exceeds 120,000,000m3.

SITE MAP

World Time

  • SENEGAL | DAKAR:08.15 08:17

  • NIGERIA | LAGOS:08.15 09:17

  • EGYPT | CAIRO:08.15 10:17

  • UAE | DUBAI:08.15 12:17

  • SRI LANKA | COLOMBO:08.15 13:47

  • SINGAPORE:08.15 16:17

  • ENGLAND | LONDON:08.15 09:17

  • RUSSIA | MOSCOW:08.15 12:17

  • CHINA | BEIJING:08.15 16:17

  • AMERICA | Los Angels:08.15 01:17

  • AMERICA | New York:08.15 04:17

  • BRAZIL | San Paulo:08.15 05:17