DREDGING WORK FOR NAVIGATIONAL CHANNEL OF GUANGZHOU PORT

Published:2015-06-02

 

 

The navigational channel of Guangzhou Port has a total length of 115km and water depth within -8.6m dredging depth ~-13.5m. The Lingding navigational channel has been dredged to be -15.5m in depth and the dredging work quantity exceeds 120,000,000m3.

SITE MAP

World Time

  • SENEGAL | DAKAR:11.27 05:48

  • NIGERIA | LAGOS:11.27 06:48

  • EGYPT | CAIRO:11.27 07:48

  • UAE | DUBAI:11.27 09:48

  • SRI LANKA | COLOMBO:11.27 11:18

  • SINGAPORE:11.27 13:48

  • ENGLAND | LONDON:11.27 06:48

  • RUSSIA | MOSCOW:11.27 09:48

  • CHINA | BEIJING:11.27 13:48

  • AMERICA | Los Angels:11.26 22:48

  • AMERICA | New York:11.27 01:48

  • BRAZIL | San Paulo:11.27 02:48