Its construction area is 30km in length and designed with bottom width of 315m and water depth -19.5m, and the dredging work quantity is 33,000,000m3.
SENEGAL | DAKAR:04.19 19:51
NIGERIA | LAGOS:04.19 20:51
EGYPT | CAIRO:04.19 21:51
UAE | DUBAI:04.19 23:51
SRI LANKA | COLOMBO:04.20 01:21
SINGAPORE:04.20 03:51
ENGLAND | LONDON:04.19 20:51
RUSSIA | MOSCOW:04.19 23:51
CHINA | BEIJING:04.20 03:51
AMERICA | Los Angels:04.19 12:51
AMERICA | New York:04.19 15:51
BRAZIL | San Paulo:04.19 16:51