Its construction area is 30km in length and designed with bottom width of 315m and water depth -19.5m, and the dredging work quantity is 33,000,000m3.
SENEGAL | DAKAR:02.01 19:45
NIGERIA | LAGOS:02.01 20:45
EGYPT | CAIRO:02.01 21:45
UAE | DUBAI:02.01 23:45
SRI LANKA | COLOMBO:02.02 01:15
SINGAPORE:02.02 03:45
ENGLAND | LONDON:02.01 20:45
RUSSIA | MOSCOW:02.01 23:45
CHINA | BEIJING:02.02 03:45
AMERICA | Los Angels:02.01 12:45
AMERICA | New York:02.01 15:45
BRAZIL | San Paulo:02.01 16:45