Its construction area is 30km in length and designed with bottom width of 315m and water depth -19.5m, and the dredging work quantity is 33,000,000m3.
SENEGAL | DAKAR:04.10 12:21
NIGERIA | LAGOS:04.10 13:21
EGYPT | CAIRO:04.10 14:21
UAE | DUBAI:04.10 16:21
SRI LANKA | COLOMBO:04.10 17:51
SINGAPORE:04.10 20:21
ENGLAND | LONDON:04.10 13:21
RUSSIA | MOSCOW:04.10 16:21
CHINA | BEIJING:04.10 20:21
AMERICA | Los Angels:04.10 05:21
AMERICA | New York:04.10 08:21
BRAZIL | San Paulo:04.10 09:21