DREDGING WORK FOR NAVIGATIONAL CHANNEL OF GUANGZHOU PORT

Published:2015-08-05

 

 

 

The navigational channel of Guangzhou Port has a total length of 115km and water depth within -8.6m dredging depth -13.5m. The Lingding navigational channel has been dredged to be -15.5m in depth and the dredging work quantity exceeds 120,000,000m3.

SITE MAP

World Time

  • SENEGAL | DAKAR:10.28 21:55

  • NIGERIA | LAGOS:10.28 22:55

  • EGYPT | CAIRO:10.28 23:55

  • UAE | DUBAI:10.29 01:55

  • SRI LANKA | COLOMBO:10.29 03:25

  • SINGAPORE:10.29 05:55

  • ENGLAND | LONDON:10.28 22:55

  • RUSSIA | MOSCOW:10.29 01:55

  • CHINA | BEIJING:10.29 05:55

  • AMERICA | Los Angels:10.28 14:55

  • AMERICA | New York:10.28 17:55

  • BRAZIL | San Paulo:10.28 18:55