The navigational channel of Guangzhou Port has a total length of 115km and water depth within -8.6m dredging depth -13.5m. The Lingding navigational channel has been dredged to be -15.5m in depth and the dredging work quantity exceeds 120,000,000m3.
SENEGAL | DAKAR:04.10 10:44
NIGERIA | LAGOS:04.10 11:44
EGYPT | CAIRO:04.10 12:44
UAE | DUBAI:04.10 14:44
SRI LANKA | COLOMBO:04.10 16:14
SINGAPORE:04.10 18:44
ENGLAND | LONDON:04.10 11:44
RUSSIA | MOSCOW:04.10 14:44
CHINA | BEIJING:04.10 18:44
AMERICA | Los Angels:04.10 03:44
AMERICA | New York:04.10 06:44
BRAZIL | San Paulo:04.10 07:44