The navigational channel of Guangzhou Port has a total length of 115km and water depth within -8.6m dredging depth -13.5m. The Lingding navigational channel has been dredged to be -15.5m in depth and the dredging work quantity exceeds 120,000,000m3.
SENEGAL | DAKAR:10.28 21:55
NIGERIA | LAGOS:10.28 22:55
EGYPT | CAIRO:10.28 23:55
UAE | DUBAI:10.29 01:55
SRI LANKA | COLOMBO:10.29 03:25
SINGAPORE:10.29 05:55
ENGLAND | LONDON:10.28 22:55
RUSSIA | MOSCOW:10.29 01:55
CHINA | BEIJING:10.29 05:55
AMERICA | Los Angels:10.28 14:55
AMERICA | New York:10.28 17:55
BRAZIL | San Paulo:10.28 18:55