DREDGING WORK FOR NAVIGATIONAL CHANNEL OF GUANGZHOU PORT

Published:2015-08-05

 

 

 

The navigational channel of Guangzhou Port has a total length of 115km and water depth within -8.6m dredging depth -13.5m. The Lingding navigational channel has been dredged to be -15.5m in depth and the dredging work quantity exceeds 120,000,000m3.

SITE MAP

World Time

  • SENEGAL | DAKAR:05.26 10:52

  • NIGERIA | LAGOS:05.26 11:52

  • EGYPT | CAIRO:05.26 12:52

  • UAE | DUBAI:05.26 14:52

  • SRI LANKA | COLOMBO:05.26 16:22

  • SINGAPORE:05.26 18:52

  • ENGLAND | LONDON:05.26 11:52

  • RUSSIA | MOSCOW:05.26 14:52

  • CHINA | BEIJING:05.26 18:52

  • AMERICA | Los Angels:05.26 03:52

  • AMERICA | New York:05.26 06:52

  • BRAZIL | San Paulo:05.26 07:52