DREDGING WORK FOR NAVIGATIONAL CHANNEL OF GUANGZHOU PORT

Published:2015-08-05

 

 

 

The navigational channel of Guangzhou Port has a total length of 115km and water depth within -8.6m dredging depth -13.5m. The Lingding navigational channel has been dredged to be -15.5m in depth and the dredging work quantity exceeds 120,000,000m3.

SITE MAP

World Time

  • SENEGAL | DAKAR:11.23 20:58

  • NIGERIA | LAGOS:11.23 21:58

  • EGYPT | CAIRO:11.23 22:58

  • UAE | DUBAI:11.24 00:58

  • SRI LANKA | COLOMBO:11.24 02:28

  • SINGAPORE:11.24 04:58

  • ENGLAND | LONDON:11.23 21:58

  • RUSSIA | MOSCOW:11.24 00:58

  • CHINA | BEIJING:11.24 04:58

  • AMERICA | Los Angels:11.23 13:58

  • AMERICA | New York:11.23 16:58

  • BRAZIL | San Paulo:11.23 17:58