The navigational channel of Guangzhou Port has a total length of 115km and water depth within -8.6m dredging depth -13.5m. The Lingding navigational channel has been dredged to be -15.5m in depth and the dredging work quantity exceeds 120,000,000m3.
SENEGAL | DAKAR:09.29 12:50
NIGERIA | LAGOS:09.29 13:50
EGYPT | CAIRO:09.29 14:50
UAE | DUBAI:09.29 16:50
SRI LANKA | COLOMBO:09.29 18:20
SINGAPORE:09.29 20:50
ENGLAND | LONDON:09.29 13:50
RUSSIA | MOSCOW:09.29 16:50
CHINA | BEIJING:09.29 20:50
AMERICA | Los Angels:09.29 05:50
AMERICA | New York:09.29 08:50
BRAZIL | San Paulo:09.29 09:50