The navigational channel of Guangzhou Port has a total length of 115km and water depth within -8.6m dredging depth -13.5m. The Lingding navigational channel has been dredged to be -15.5m in depth and the dredging work quantity exceeds 120,000,000m3.
SENEGAL | DAKAR:11.24 10:58
NIGERIA | LAGOS:11.24 11:58
EGYPT | CAIRO:11.24 12:58
UAE | DUBAI:11.24 14:58
SRI LANKA | COLOMBO:11.24 16:28
SINGAPORE:11.24 18:58
ENGLAND | LONDON:11.24 11:58
RUSSIA | MOSCOW:11.24 14:58
CHINA | BEIJING:11.24 18:58
AMERICA | Los Angels:11.24 03:58
AMERICA | New York:11.24 06:58
BRAZIL | San Paulo:11.24 07:58