The navigational channel of Guangzhou Port has a total length of 115km and water depth within -8.6m dredging depth -13.5m. The Lingding navigational channel has been dredged to be -15.5m in depth and the dredging work quantity exceeds 120,000,000m3.
SENEGAL | DAKAR:05.26 10:52
NIGERIA | LAGOS:05.26 11:52
EGYPT | CAIRO:05.26 12:52
UAE | DUBAI:05.26 14:52
SRI LANKA | COLOMBO:05.26 16:22
SINGAPORE:05.26 18:52
ENGLAND | LONDON:05.26 11:52
RUSSIA | MOSCOW:05.26 14:52
CHINA | BEIJING:05.26 18:52
AMERICA | Los Angels:05.26 03:52
AMERICA | New York:05.26 06:52
BRAZIL | San Paulo:05.26 07:52